HOW TO DIG A TRENCH
Method 1: Using a surveyor’s rover or a benchmark.
NB: After entering the height, a second icon appears to speed up the next entry. Clicking this icon sets the value shown in the overlay, in this case 2.5 m, as the current depth. This can be used once the machine tracks have moved in order to re-bench from a previously graded area.
Method 2: Using the bottom of the trench as a reference
NB: After entering the height for the first time, a second icon appears to speed up the next entry. Clicking this icon sets the value shown in the overlay, in this case “0m”, as the current depth.
Download the PDF
- en/how_to_dig_a_trench_en.txt
- Dernière modification : 2025/12/16 12:03
- de
clotilde









