en:digging_a_trench_with_a_slope

Ceci est une ancienne révision du document !


DIGGING A TRENCH WITH A 2% SLOPE


creuser une tranchée avec une pente

Activate Slope mode.

Enter 2%, then confirm.

Align your boom with the trench.

Place the tip of the bucket on the surveyor's stake or benchmark, then click on “depth”.

Enter “2.5m” as the height (the height between your bucket and the bottom of the trench), then confirm.

Follow the instructions on the screen to achieve the desired slope.


Activate Slope mode.

Enter 2% then confirm.

Align your boom with the trench.

Place the tip of the bucket on the surveyor's stake or benchmark, then click on “depth”.

Enter “0m” as the height (the height between your bucket and the bottom of the trench) then confirm.

Follow the instructions on the screen to achieve the desired slope.

  • en/digging_a_trench_with_a_slope.1764066764.txt.gz
  • Dernière modification : 2025/11/25 11:32
  • de clotilde