Table des matières

DIGGING A TRENCH WITH A 2% SLOPE


Method 1: Using a benchmark.

creuser une tranchée avec une pente

Activate Slope mode.

Enter 2%, the, confirm.

Align your boom with the trench.

Place the tip of the bucket on the surveyor's stake or benchmark, then click on “depth.”

Enter “2.5m” as the height (the height between your bucket and the bottom of the trench) then confirm.

Follow the instructions on the screen to achieve the desired slope.


Method 2: without knowing the height of the laser.

Activate slope mode.

Enter 2% the, confirm.

Align your boom with the trench.

Place the tip of the bucket on the surveyor's stake or benchmark, then click on “depth.”

Enter “0m” as the height (the height between your bucket and the bottom of the trench) then confirm.

Follow the instructions on the screen to achieve the desired slope.